Underground, service entrance, switchgear, distribution, lighting and low‑voltage pathways for new commercial and industrial buildings.
Ground‑Up Construction
We start with underground and slab conduit, set the service and switchgear, run distribution and branch circuits, and finish with lighting, controls and testing. One project manager carries the job from mobilization to closeout and keeps your superintendent informed at every inspection.
Process
01
Drawing review, RFIs, submittals and long‑lead gear released early.
02
Duct banks, slab stub‑ups and in‑wall rough‑in sequenced with the other trades.
03
Service entrance, switchgear, transformers and feeders set and terminated.
04
Devices, fixtures and controls, then testing, inspections and closeout documents.
Project experience
FAQ
Yes. We pull the electrical permit, schedule inspections and walk them with your superintendent.
As early as design development. Reviewing drawings before bid lets us flag conflicts and price the scope accurately.
Capabilities
Drawing review, load calculations, value engineering and design‑assist with your architect and engineer.
Learn more
Generator sizing, setting and connection, automatic transfer switches, startup and load‑bank testing.
Learn more
High‑voltage conduit, switchgear integration, solar subcontract work and EV charging infrastructure.
Learn more
Preventive maintenance, generator service, troubleshooting and 24‑hour emergency response.
Learn more
Search
Markets and capabilities
Looking for an article instead?